-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Blowout, Campfire Bore, Mulgathing, Jumbuck, Mobella and Sandstone (the Gawler Project Central Tenements Area). Joint venture operators' separate joint annual reports for the period 1/7/2010 to 30/6/2017.
Work targeting Archaean to Proterozoic iron ore in BIF that was carried out by the Iron Road JV partners during 2010-2011 comprised studies of the geological setting and physical characteristics of magnetite iron mineralisation delineated by Stage I...-
Document
Published: 30 Nov 1918