-
Strawberry Hill. Progress and final reports to licence expiry for the period 4/10/89 to 3/1/94.
Exploration in the Wanilla - Cummins area searching for economic accumulations of heavy minerals in Eocene sands comprised 2 phases of aircore drilling (167 holes, total 4049 m). A resulting drill intersection yielded a 0.72% heavy-mineral...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tooligie Hill. Annual reports submitted until the commencement of joint reporting on Southern Eyre Peninsula JV Project, for the period 3/12/1999 to 10/3/2006.
There is no abstract created for this record-
Document
-
ExpNotes LINCOLN: Explanatory Notes LINCOLN, SI 53-11.
The LINCOLN 1:250,000 scale regional geological map area covers southern Eyre Peninsula and includes numerous islands lying off its eastern, southern and western coasts. The region encompasses a complex geological history and contains a variety of...-
Document
-
The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 2018
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 2008