Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-