Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Ironstone Hill (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 17/9/2003 to 17/9/2015.
During the majority of its tenure term, very little field work was conducted on the subject ground. Initially, office studies of available geophysical and open file geological data were performed during 2005 to try to identify possible drilling...-
Document