-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
RB 2009/00022 Stuart Shelf geochemical project.
The Carrapateena mineral discovery was the outcome of a PACE Initiative drilling project co-funded by RMG Services Pty Ltd and the Government of South Australia. Two holes were drilled, the second of which (CAR002) encountered a major body of...-
Document
Published: 01 Dec 2009