-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Pernatty Lagoon. Progress reports and final report to licence expiry/renewal, for the period 20/7/1973 to 19/7/1975.
Ongoing appraisal work conducted by CSR at the company's newly discovered Cattlegrid copper deposit that lies at the top of the Pandurra Formation has included infill rotary percussion and diamond drilling (13 holes for 554 m, including 166 m cored),...-
Document
-
Emmie Bluff. Progress reports and annual reports to licence expiry/full surrender, for the period 21/6/1976 to 20/6/1978.
Ongoing exploration for possible buried Olympic Dam-style Cu-Au-U mineralisation, conducted over an area of the Stuart Shelf located 15 km south-east of Arcoona Homestead, has comprised RC drilling (20 holes, aggregate penetration 1768 m) and diamond...-
Document