-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-22, Lake Gilles - Corunna North area (north-western margin of Spencer Domain) IOCG mineral prospects. Project final report.
Potential Carrapateena or Prominent Hill style IOCG targets represented by newly recognised gravity anomalies in the eastern Lake Gilles area were the reason for a PACE Initiative Year 4 drilling funds proposal submitted to PIRSA by InterMet...-
Document
-
RB 2007/00006 The geology and mineral potential of the PORT AUGUSTA [mapsheet] area, eastern Gawler Craton.
The PORT AUGUSTA 1:250,000 mapsheet area covers the north-eastern part of the Eyre Peninsula, the northern Spencer Gulf and the south-western Flinders Ranges, and extends from latitude 32°00'S to 33°00'S and longitude 136°30'S to 138°00'S. The main...-
Document
Published: 01 Apr 2007
-
RB 2007/00015 Geochronology of the Gawler Craton, South Australia.
Geochronology enables us to determine the age of rocks and minerals. The variety of isotopic geochronological techniques give complementary information on, for example, the timing of igneous or metamorphic crystallisation, as is often the case for the...-
Document
Published: 01 Sep 2007
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017