-
The Murray Basin Project. Joint progress reports and joint final report to remnant licences' full surrender, for the period 7/10/1980 to 6/12/1984.
Thirteen contiguous exploration licences located along the western margin of the Tertiary Murray Basin were taken up by CRA to search for economic buried brown coal / lignite deposits of the type already known from small discoveries that had been made...-
Document
Published: 07 Mar 1985
-
RB 75/00041 Monarto new town - Paragum stratigraphic bore completion report, section 1972-17.
A stratigraphic bore was completed by cable tool drilling to a depth of 48m at Paragum Station, monarto South, in connection with the Regional Hydrological Survey. The hole intersected Blanchetown Clay, Parilla Sand and Mannum Limestone over phyllite...-
Document
Published: 01 Jan 1975
-
The Padthaway Ridge Sedimentary Uranium Project. Joint annual technical reports to licences' combined full surrender, for the period 30/1/2008 to 3/9/2013.
A package of fourteen mineral exploration tenements were taken up that straddled the north-eastern and south-western sides of the Padthaway Ridge, to allow the licensee to explore both the Tertiary Murray Basin and Gambier Basin sediments where they...-
Document
Published: 16 Jul 1913