-
Emu Hill. Progress and annual reports plus final report to licence expiry/full surrender, for the period 22/4/1991 to 21/4/1996.
Diamond exploration undertaken north-west of Moolawatana included the acquisition of airborne magnetic / radiometric and ground magnetic surveys, plus soil, stream sediment, gravel, loam and rock chip sampling, and aircore/diamond drilling (25 holes,...-
Document
-
Progress reports on exploration of seven mining claims in the Big Lode mine area, for the period January 1971 to December 1972.
An area of 1.2 square km surrounding the Big Lode mine historic copper workings was reserved for 18 months under tenure of seven Mining Claims, to allow for the detailed geological mapping of rock structures possibly controlling observed secondary...-
Document
-
Freeling Heights - Moolowatana - Prospect Hill area. Progress reports to licence expiry/renewal for the period 25/3/1971 to 24/3/1972.
Continuing detailed investigations of various copper prospects in the far northern Flinders Ranges, principally in the vicinity of Mount Fitton, were pursued by conducting surface geological mapping, IP and magnetic surveys, and rock chip and stream...-
Document
-
RB 2009/00001 Explanatory Notes for [the] CALLABONNA 1:250 000 Geological Map, sheet SH 54-6.
The CALLABONNA map area includes the southern end of the Strzelecki Desert and the north- eastern Flinders Ranges, between latitudes 29° to 30° S and longitudes 139° 30' to 141° E. Cameron Corner adjoins New South Wales and Queensland in the...-
Document
Published: 01 Oct 2009
-
ExpNotes CALLABONNA: Explanatory Notes CALLABONNA
There is no abstract created for this record-
Document