-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Mulga Well. Annual reports to licence expiry/full surrender, for the period 22/6/2004 to 21/6/2009.
An area located close to the western margin of the Stuart Shelf, approximately 90-120 km south-west of the Olympic Dam deposit, and extending parallel to it for 65 km, was taken up by Marathon Resources (Marathon) to explore for possible economic IOCG...-
Document
-
Garford [Outstation], Indooroopilly Outstation and Half Moon Lake (the Challenger West Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 30/4/2003 to 13/10/2010.
The three licences comprising the Challenger West Project were taken up principally to explore for economic gold, which could possibly occur in strike extensions of known gold lodes formed within Archaean basement rocks that constitute the Challenger...-
Document
-
Mount Finke. Annual reports and final report to licence full surrender, for the period 2/12/2004 to 22/9/2010.
Exploration for possible economic buried sedimentary uranium deposits has been carried out in an area located 60-70 km south-west of Tarcoola, entirely blanketed by Quaternary aeolian sands, which holds sections of the preserved remnants of the...-
Document
Published: 15 Feb 2010
-
Centre Hill (the Kingoonya JV Project). Annual reports to licence expiry/full surrender, for the period 7/3/2006 to 10/5/2012.
An area extending for approximately 80-115 km south-east of Tarcoola has been explored for possible economic mesothermal gold±copper mineralisation formed in Mesoproterozoic igneous basement, possible unconformity - related uranium mineralisation at...-
Document
Published: 12 Jul 2012
-
Data release [made at SA Director of Mines' discretion] : North-western Eyre Peninsula (eastern Eucla Basin) heavy mineral sands exploration tenement group [Group 3]. Joint annual reports for the period 1/7/2004 to 31/5/2010. [Index part 1 of 2].
As part of a continuing search for possible economic, zircon-rich Tertiary marine placer mineral sands deposits within its tenement holdings in the eastern Eucla Basin, licensee Iluka Resources carried out scout drilling on ELs 3163, 3201 and 3203...-
Document
Published: 01 Sep 2010
-
Wildingi Claypan (part of the Central Gawler Project). Annual reports to licence expiry/full surrender, for the period 5/10/2005 to 13/1/2015.
Two separate small areas located just north of Comet Outstation, that were originally taken up to explore for possible diamonds and Triassic-Jurassic kimberlite intrusions that could be associated with intensely faulted shallow basement, have also...-
Document
Published: 19 Dec 2014
-
Data release [made at SA Director of Mines' discretion] : North-western Eyre Peninsula (eastern Eucla Basin) heavy mineral sands exploration tenement group [Group 3]. Joint annual reports for the period 1/7/2004 to 31/5/2010. [Index part 2 of 2].
Within the subject south-eastern Eucla Basin tenements, Iluka's ongoing exploration has targeted the Tertiary-aged beach sands deposited during the five marine incursions that occurred from the Middle Eocene to the Pliocene, with a focus on exploring...-
Document
Published: 01 Sep 2010
-
Data release - as updated [made at SA Director of Mines' discretion] : Aurora Tank and Indooroopilly Outstation. Joint annual reports for the period 21/3/2011 to 20/3/2013.
Two separate tenements in the Challenger district which are now wholly owned by Marmota Energy Limited are being explored for possible economic buried Challenger style gold mineralisation that may be present within Archaean basement, and also, within...-
Document
Published: 12 Jul 2013
-
The Eyre Peninsula Joint Venture Project. Joint annual reports for the period 19/9/2002 to 31/12/2008.
A number of tenements on central northern Eyre Peninsula are being explored by Adelaide Resources and its joint venture partner Newmont Mining for possible economic buried deposits of gold, copper and other base metals which may have formed in the...-
Document
Published: 27 Feb 2009
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 2019
-
Carnding. Annual reports and final report to licence full surrender, for the period 18/1/2006 to 22/2/2012.
Three separate small sub-blocks forming a licence in the Tarcoola district have been explored for possible economic buried Tertiary sandstone-hosted uranium mineralisation and for any other metallic mineralisation that may have formed in underlying...-
Document
Published: 29 Feb 2012