-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-12 - Corunna Station, north-eastern Eyre Peninsula, structurally controlled Mesoproterozoic epithermal Ag-Au and base metal prospects. Drilling final report.
Musgrave Minerals Ltd (MGV) is the holder of the subject EL 5497 Corunna North, located in the southern Gawler Ranges approximately 65 km west of Port Augusta and 10 km north of Iron Knob, where it is exploring for economic base and precious metal...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kolendo, Taringa, Nonning, Wipipippee and Menninnie Dam (the Menninnie Project). Joint annual reports for the period 1/1/2013 to 31/12/2016.
The Menninnie JV Project area consists of five contiguous exploration licences, and is considered prospective for Pb-Zn-Ag-Cu-Au-Mo-U deposits associated with past epithermal, porphyry, IOCG and skarn - forming geological environments. It lies in a...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-25, southern Gawler Ranges Volcanic Province, Victory IOCG mineral prospect. Project final report.
Southern Gold Ltd, in joint venture with Hindmarsh Resources, has drilled four vertical RAB with diamond tail holes on Exploration Licence 3158 from October to November 2005 as part of the PACE Initiative Year 2 programme. Its objective was to test a...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-17, Menninnie Dam area base metal and gold mineral prospects. Project final report.
During February-July 2005, a PACE Initiative collaborative drilling programme with PIRSA was prepared and undertaken by Terramin Australia at the Menninnie Dam prospect to investigate two objectives: · The B1 cerussite target identified by drilling...-
Document