-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Toondulya Bluff. Annual reports to licence expiry/full surrender, for the period 25/11/2016 to 24/11/2018.
An area located approximately 100 km NE of Streaky Bay has been explored for possible economic buried lode gold or copper-gold mineralisation that may occur at depth within Proterozoic basement, and would probably be genetically related to an inferred...-
Document
Published: 29 Jan 1919
-
Data release (in part made in lieu of submitting a second partial surrender report) : Uno Range (part of the East Eyre Peninsula Project). Annual reports for the period 1/8/2011 to 31/7/2020.
A licence consisting of two separate sub-blocks located ~30 km west-northwest of Iron Knob is being explored for possible economic buried Paris type epithermal/hydrothermal gold and silver mineralisation, as well as for Menninnie Dam type...-
Document
Published: 18 Dec 1920
-
Lake Gilles - Uno [Range] area. Annual reports and final report to licence expiry/full surrender, for the period 11/2/2001 to 28/9/2010.
Exploration of an area abutting the northern side of Lake Gilles, and located in the vicinity of the major Uno Fault structure and the Gawler Ranges volcanic province, 70 km north-west of Whyalla, has sought to find economic epithermal/hydrothermal,...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Toondulya Bluff. Annual reports to licence expiry/full surrender, for the period 14/1/2004 to 14/7/2013.
A licence area centred about 100 km north-east of Streaky Bay township, on the south-western perimeter of the Gawler Ranges, was taken up to explore for possible economic buried IOCG mineralisation or Tunkillia stye fracture controlled lode gold...-
Document
Published: 06 Nov 1913