-
Data release [made at SA Director of Mines’ discretion] : Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Annual reports for the period 24/9/2001 to 23/9/2005.
The buried Menninnie Dam zinc-lead(-silver-copper) deposit, located approximately 55 km north of Kimba on northern Eyre Peninsula, and sitting adjacent to the south-eastern margin of the Gawler Ranges, is being evaluated for its future commercial...-
Document
-
Data release - as updated : Moonabie (part of the East Eyre Peninsula Project). Annual reports plus final report to licence expiry/full surrender, for the period 1/5/2006 to 13/3/2017.
A licence consisting of three separate sub-blocks that are centred approximately 60 km WSW of Whyalla is being explored for possible economic primary uranium mineralisation plus precious and base metals, in a structurally complex epithermal and...-
Document
Published: 29 Apr 1917
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-17, Menninnie Dam area base metal and gold mineral prospects. Project final report.
During February-July 2005, a PACE Initiative collaborative drilling programme with PIRSA was prepared and undertaken by Terramin Australia at the Menninnie Dam prospect to investigate two objectives: · The B1 cerussite target identified by drilling...-
Document