-
RB 76/00036 Engineering soils survey, Stuart Highway, Coober Pedy area. Four Mile diggings to vermin-proof fence.
A series of 67 backhoe pits, excavated over a distance of 40km along one of the proposed routes of the new Stuart Highway northwest from Coober Pedy has indicated that the following materials are present: • An expansive clay (Callabonna Clay) up to...-
Document
Published: 16 Mar 1976
-
ExpNotes COOBER PEDY: Explanatory Notes COOBER PEDY
There is no abstract created for this record-
Document