PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-50, Mount Hope Project area stratigraphic drilling on potential Archaean VHMS mineral prospects. Project final report.
The PACE Initiative Year 4 subsidised auger drilling programme undertaken on the Mount Hope (EL 3355) / Brimpton Lake (EL 3561) mineral exploration tenements was a trial to test the application of a new low cost drilling technique to exploring under...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Hope. Annual reports for the period 12/4/2002 to 14/3/2019.
Exploration of an area located on western Eyre Peninsula between Sheringa and Mount Hope is continuing, with the intent of discovering economic buried base and precious metal deposits of volcanogenic sediment-hosted massive sulphide (VHMS) style...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kapinnie (part of the Brimpton Lake Project). Annual reports for the period 17/9/2003 to 4/3/2010.
An area extending to the north of Kapinnie on western Eyre Peninsula area is being explored by grant licensee Anglo American and (since March 2003) its joint venture partner Lynch Mining, looking for possible buried economic Archaean volcanic or...-
Document
-
Data release - as updated : Brooker (part of the Brimpton Lake Project). Annual reports to licence expiry/full surrender, for the period 12/6/2003 to 24/8/2018.
Exploration Licence 3096 “Brooker” covering an area of 682 square km lies east of Elliston on the Eyre Peninsula in South Australia. It is one of three adjacent tenements that form the “Brimpton Lake Project”; the other two are EL 2662 (initially...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-52, Oakdale Project area Archaean VHMS mineral prospects. Project final report.
Five rotary precollared, NQ2 diamond drillholes were completed as a PACE Year 4 subsidised drilling project (DPY4-52) between January 2007 and June 2007, during a regional diamond drilling programme on the licensee's ELs (involving overall ~ 6000 m of...-
Document