-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-38, Central Gawler Gold Province, Barns West and Baggy Green North gold prospects. [8 x RC drillholes] Project final report.
PACE Initiative Year 3 drilling project funds were secured by Adelaide Resources to evaluate a number of previously detected IP anomalies inferred to originate from sources in the Mesoproterozoic basement and saprolitic cover in the vicinity of the...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-21 - Eyre Peninsula Project, Central Gawler Gold Province, Baggy Green North prospect biogeochemical anomaly. Drilling project final report.
Early in 2016, Adelaide Resources submitted a proposal to DSD for a grant of PACE Initiative Year 9 collaborative drilling project subsidy funds to help it drill ~80 exploratory aircore or RC holes for a total of approximately 8000 m to further...-
Document
-
Wudinna and Chilpuddie Hill. Progress reports and partial relinquishment/final reports, respectively, for the period 30/7/1985 to 29/7/1990.
TARGET: Exploration in the Minnipa - Kyancutta region for uranium in Recent lake sediments, heavy mineral sands in Tertiary palaeochannels, base and precious metals in basement rocks, and diamonds associated with possible kimberlitic intrusions....-
Document
Published: 02 Aug 1990
-
RB 2006/00004 Crustal evolution of the Gawler Craton, South Australia: Application of the TerraneChron technique to detrital zircon from modern stream sediments.
This report presents the results of a Terranechron [registered brand name for this proprietary technique] study of detrital zircons from modern stream sediments of the Gawler Craton. The Terranechron approach involves obtaining uranium - lead decay...-
Document
Published: 01 Feb 2006
-
Wedge Hill (Mount Wedge Project). Annual and final reports for the period 26/5/1997 to 25/5/1999.
Groundwater sampling, aeromagnetic interpretation, shallow auger sampling and isotope studies were carried out over an area 30 km northeast of Elliston. Heavy mineral concentrates from composite auger samples contained zircon, galena and sphalerite,...-
Document
-
Venus Bay. Annual reports and final report to licence full surrender, for the period 27/7/1994 to 21/12/1998.
Diamonds and base and precious metal exploration undertaken north-east of Port Kenny on western Eyre Peninsula comprised loam sampling for kimberlite indicator minerals, RC drilling (7 vertical holes, total 470 m), plus bedrock petrological, heavy...-
Document