-
Mabel Creek. Annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 20/12/1999 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 50...-
Document
-
Woorong Creek. Data release : annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 1/6/2000 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 45...-
Document
-
Bindabu Bore. Annual and final reports to licence expiry/full surrender for the period 19/11/2007 to 18/11/2009.
Exploration for possible economic iron oxide - associated copper-gold (IOCG) deposits formed in buried Archaean to Proterozoic basement of the western Mabel Creek Ridge has consisted only of desktop prospectivity studies carried out by a consultant....-
Document
Published: 30 Apr 2010