PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-21 - Eyre Peninsula Project, Central Gawler Gold Province, Baggy Green North prospect biogeochemical anomaly. Drilling project final report.
Early in 2016, Adelaide Resources submitted a proposal to DSD for a grant of PACE Initiative Year 9 collaborative drilling project subsidy funds to help it drill ~80 exploratory aircore or RC holes for a total of approximately 8000 m to further...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium for the period 11/10/1996 to 10/10/2009 [ Index Part 1 of 2 ].
The four Stuart Shelf Joint Venture Project exploration licences collectively cover approximately 2668 square km of semi-arid pastoral land surrounding the Olympic Dam mine and extending east and south-eastwards as far as Lake Torrens [the Olympic Dam...-
Document
-
Ilkina, Acraman, Yarranna Hill, Poondana Rock, Waddikee Rocks, Mount Sturt, Yaninee, Nunjikompita, Poochera, Wandana and Smoky Bay (Narlaby Palaeochannel area). Combined progress and technical reports for the period 5/1/81 to 31/12/83.
Carpentaria's exploration for sandstone type uranium deposits in the West Coast region of SA over the period 1979-1982 has revealed a major Tertiary buried palaeochannel system. The main Narlaby Palaeochannel is 170 km long, up to 10 km wide and is...-
Document
-
Wudinna and Chilpuddie Hill. Progress reports and partial relinquishment/final reports, respectively, for the period 30/7/1985 to 29/7/1990.
TARGET: Exploration in the Minnipa - Kyancutta region for uranium in Recent lake sediments, heavy mineral sands in Tertiary palaeochannels, base and precious metals in basement rocks, and diamonds associated with possible kimberlitic intrusions....-
Document
Published: 02 Aug 1990
-
Wedge Hill (Mount Wedge Project). Annual and final reports for the period 26/5/1997 to 25/5/1999.
Groundwater sampling, aeromagnetic interpretation, shallow auger sampling and isotope studies were carried out over an area 30 km northeast of Elliston. Heavy mineral concentrates from composite auger samples contained zircon, galena and sphalerite,...-
Document
-
Venus Bay. Annual reports and final report to licence full surrender, for the period 27/7/1994 to 21/12/1998.
Diamonds and base and precious metal exploration undertaken north-east of Port Kenny on western Eyre Peninsula comprised loam sampling for kimberlite indicator minerals, RC drilling (7 vertical holes, total 470 m), plus bedrock petrological, heavy...-
Document