-
Lake Labyrinth (part of the Gawler and the Labyrinth Joint Venture Projects). Data release at second partial relinquishment : project licences' combined annual reports for the period 27/8/1999 to 28/9/2008.
In a continuation of exploration for economic deposits of gold and base metal mineralisation in the Lake Labyrith area, joint venture operator MIM Exploration carried out a proprietary 'MIMDAS' geophysical survey (utilising combined dipole-dipole IP...-
Document
Published: 18 Mar 2009
-
Data release [made at SA Director of Mines' discretion] : Lake Labyrinth West - Lake Harris West area (the Glenloth JV Project). Annual reports to licence expiry/renewal, for the period 25/5/1998 to 10/7/2008.
Continued exploration for Archaean lode-style gold and Mesoproterozoic Hiltaba Suite granite-related hydrothermal Cu-Au within the retained southern former subarea 'B' of EL 2518 located ~40 km south-east of Tarcoola, where there is also potential...-
Document
Published: 08 Oct 2008
-
RB 2002/00011 Harris Greenstone Domain bedrock drilling, May-August 2001.
The Harris Greenstone Domain bedrock drilling program - Phase 1, carried out during May to August 2001, has determined depths to basement, the basement lithology, and has outlined areas of anomalous gold, nickel and chromium geochemistry within...-
Document
Published: 01 Jul 2002
-
RB 2003/00017 Gawler Craton 2003. State of play - The Excursion.
Following on from the highly successful Gawler Craton - State of Play 2002 conference held by PIRSA in Adelaide in December 2002, the Gawler Craton Team of PIRSA's Geological Survey Branch has recently undertaken a major excursion across the craton....-
Document
Published: 01 Sep 2003