-
Kirwan mine area. Progress and final reports for the period 16/11/84 to 15/11/85.
Geochemical traverses made in the southern part of the Worumba Anticline, 25 km east south-east of Hawker, looking for possible shale-hosted lead-zinc mineralisation developed over the stratigraphic contact between the Kirwan Siltstone and the...-
Document