-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-42, Talia Hill area (Harris Greenstone Domain) copper-nickel and platinum group elements mineral prospects. Project final report.
In December 2005 Mithril Resources completed five RC percussion drillholes totalling 682 m on three 100 m - spaced traverses, as one of the approved PACE Initiative Year 2 subsidised drilling projects. This drilling was intended to test a surface TEM...-
Document
-
RB 2003/00010 Regolith characterisation and geochemistry as an aid to mineral exploration in the Harris Greenstone Belt, central Gawler Craton, South Australia.
Komatiitic greenstones were first recognised in South Australia from drillcore at Lake Harris on the Gawler Craton by Mines and Energy SA personnel in 1991. Subsequent petrography and detailed aeromagnetic data interpretation led to targeted drilling...-
Document
Published: 01 May 2004
-
Gawler Province regional geology 3D Model (3D version 1).
The Gawler Province 3D Geological Model is the second product of PIRSA's early 3D modelling trials conducted using 3D GeoModeller software. The work began with identifying the statigraphic units that were to be modelled. Due to the regional scale of...-
Model
- ZIP,
-
Talia Hill. Annual reports and final report to licence expiry/full surrender, for the period 19/9/2001 to 25/6/2009.
During the late 1990s, company exploratory drilling of the Harris Greenstone Belt in the central Gawler Craton, south of Tarcoola, revealed a package of previously unknown, shallowly buried komatiite lava beds with a strike length in excess of 350 km...-
Document