-
RB 73/00144 Second progress report Eyre Highway groundwater survey, Penong to the Western Australian border.
This report summarizes results of drilling to obtain water supplies for construction of the Eyre Highway, to the beginning of June, 1973. Drilling problems in the limestone have been encountered. Production from open trenches has been moderately...-
Document
Published: 01 Jan 1973