-
Interim report on mapping of surficial materials in ELs 113 and 114.
The Kapunda region is principally one in which prolonged denudation, or lowering of the landsurface, has been operative over the past 100 Ma, while the present topographic amplitude of the region is also at its greatest since the onset of the...-
Document
-
RB 73/00144 Second progress report Eyre Highway groundwater survey, Penong to the Western Australian border.
This report summarizes results of drilling to obtain water supplies for construction of the Eyre Highway, to the beginning of June, 1973. Drilling problems in the limestone have been encountered. Production from open trenches has been moderately...-
Document
Published: 01 Jan 1973