The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 1918
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 1919