-
Murray Bridge. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 15/7/1991 to 14/1/1994.
Exploration was undertaken by BHP along the western margin of the Murray Basin, between Lake Alexandrina and Cambrai township, for possible economic heavy mineral sands and for exhalative sedex-style volcanogenic/stratabound base metal deposits, both...-
Document
-
Morgan. Final report at licence full surrender, for the period 12/4/2007 to 16/7/2014.
After its purchase of the subject EL 5069 on 8/7/2013, a single drilling campaign was undertaken by Iluka Resources during August-October 2013, when 11 RC aircore vertical open holes were drilled for a total penetration of 266.5 m. Ten of the holes...-
Document
Published: 09 Jul 1914
-
RB 2003/00009 Northern Murray Basin drilling and interpretations, 2001.
Stratigraphic drilling has been undertaken by PIRSA in the South Australian portion of the northern Murray Basin to investigate the stratigraphy and sedimentology of the Cainozoic sedimentary sequences, as well as the heavy mineral sand potential of...-
Document
Published: 01 Aug 2003