-
Murray Bridge. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 15/7/1991 to 14/1/1994.
Exploration was undertaken by BHP along the western margin of the Murray Basin, between Lake Alexandrina and Cambrai township, for possible economic heavy mineral sands and for exhalative sedex-style volcanogenic/stratabound base metal deposits, both...-
Document
-
Morgan. Final report at licence full surrender, for the period 12/4/2007 to 16/7/2014.
After its purchase of the subject EL 5069 on 8/7/2013, a single drilling campaign was undertaken by Iluka Resources during August-October 2013, when 11 RC aircore vertical open holes were drilled for a total penetration of 266.5 m. Ten of the holes...-
Document
Published: 09 Jul 1914