-
Lilydale, SA. Progress report and final report to licence expiry/full surrender, for the period 1/4/1969 to 31/3/1971.
An airborne scintillometer reconnaissance with ground-based follow-up, a geochemical study of groundwater, and open-hole rotary mud drilling (10 vertical holes, total 3205 feet) plus downhole wireline geophysical logging failed to locate significant...-
Document
-
Mantung (part of the Murray Basin Project). Second partial surrender report, for the period 14/10/1997 to 15/10/2013.
A block comprising 319 square km or ~12.7% of the north-western corner of EL 5223 has been relinquished due to its now perceived diminished prospectivity for containing economic heavy mineral sands mineralisation, due to the apparent general absence...-
Document