-
RB 67/00105 Murray Bridge to Onkaparinga pipeline pumping station no. 1, primary pumping station. Geological and geophysical investigations progress report 2, design stage - EWS Department.
The site of a pumping station at Murray Bridge was investigated by 1310m of seismic refraction traverses, a push tube-diamond cored hole to 41.61m, and two cable tool holes to 44.68 and 48.86m. The site is underlain by Recent river clays and sands...-
Document
Published: 01 Jan 1967
-
Mannum. First partial relinquishment report for the period from 13/11/1978 to 12/5/1979.
Nine rotary mud open holes with a total penetration of 499.3 m were drilled, chip sampled and geophysically logged in a search for Moorlands - type coal in Eocene Renmark Beds to the south-east of Murray Bridge. Although the target horizon was...-
Document