Data release [made at SA Director of Mines' discretion] : Lake Gilles. Annual reports submitted until the commencement of the Eurilla JV Project licences' joint reporting, for the period 30/1/2007 to 29/1/2010.
A sparsely drill-tested area centred about 10 km west of Lake Gilles is being explored for a variety of buried, possibly economic basement-hosted polymetallic mineralisation occurrences, including deposits of Menninnie Dam style Pb-Zn-Ag (Cu-Au),...-
Document
Published: 30 Mar 1910
-
Stony Hill (part of the Northern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 2/12/2004 to 23/12/2016.
During the life of the subject licence, the focus of exploration was to determine the area's potential for DSO haematite iron ore, with a secondary consideration being magnetite and haematite BIF. After conducting geophysical surveys and exploratory...-
Document
Published: 17 Jan 1917
-
Eastern Eyre Peninsula. Progress reports and final report to licence expiry/full surrender, for the period 25/10/1976 to 24/10/1978.
Stratabound, metasedimentary iron ore was the principal target of exploration undertaken by BHP over a large area surrounding the Moonabie Range that extends along strike and borders the north-western side of Spencer Gulf. Base and precious metals...-
Document
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document