-
Elbow Hill. Information status at licence surrender, for the period 12/4/2013 to 29/5/2014: no work performed.
There is no abstract created for this record-
Document
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Elbow Hill supplementary area. Information status at licence surrender, for the period 13/6/2013 to 9/9/2014: no work performed.
There is no abstract created for this record-
Document
-
Pinerow. Data release made in lieu of submitting a first partial surrender report : annual reports for the period 23/5/1996 to 2/10/2004.
As part of a regional search for hydrothermal / epithermal gold and base metals, EL 2167 joint venturer Goldstream Mining over the period October 1996 - March 1999 undertook three phases of regional and detailed geochemical sampling in the poorly...-
Document
Published: 10 Mar 1905