-
RB 96/00017 River Murray water resource management. Assessment of salt load impacts and drainage hazard for new irrigation development along the River Murray in South Australia.
The Murray-Darling Basin Commission (MDBC) has a commitment in the national interest to managing the health of the River Murray and floodplain environment by mitigating both decreases in river water quality and associated environmental degradation...-
Document
Published: 01 May 1996
-
RB 67/00105 Murray Bridge to Onkaparinga pipeline pumping station no. 1, primary pumping station. Geological and geophysical investigations progress report 2, design stage - EWS Department.
The site of a pumping station at Murray Bridge was investigated by 1310m of seismic refraction traverses, a push tube-diamond cored hole to 41.61m, and two cable tool holes to 44.68 and 48.86m. The site is underlain by Recent river clays and sands...-
Document
Published: 01 Jan 1967