-
Preliminary feasibility study for the Wintinna Coal Project.
This report sets out the results of a pre-feasibility study carried out for the Wintinna Coal Project in South Australia. Contained in it are a description of the facilities and preliminary cost estimates for the development of the project. The study...-
Document
-
Dewatering investigations, Lake Phillipson area, South Australia.
An initial investigation programme aimed at obtaining hydraulic data from part of the Lake Phillipson Permian coal field been successfully completed. The initial area under consideration for mining is of approximately 130 hectares within the Western...-
Document
-
Data release - as updated : England Hill, Arckaringa and Copper Hill (the Arckaringa Coal Project). Joint annual reports and joint final report to licences' expiry/full surrender, for the period 7/6/2005 to 6/6/2019.
Under a new strategic focus, three licence areas covering three Early Permian buried coal deposits located at Wintinna, Westfield and Murloocoppie in the northern part of the Arckaringa Basin, ~120 km north of Coober Pedy, have been evaluated both for...-
Document
Published: 29 Aug 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 9/8/2010 to 8/8/2015.
During licence Year 16, on its renewed EL 4534 over the period October to December 2010, South Australian Coal Limited (SA Coal) undertook a drilling campaign of 15 rotary mud partly cored vertical holes for 2871 m which included 2064.7 m of coring,...-
Document
Published: 01 Sep 1916
-
Canegrass Ridge and Nilpinna Spring. Joint progress reports and joint final report to licences' respective expiry/full surrender, for the period 1/12/1980 to 7/12/1981.
Two licence areas respectively flanking the eastern and western sides of the southern Peake and Denison Ranges were taken up to investigate the alluvial diamond potential of sediments within basinal margin settings, in view of diamond indicator...-
Document