Rehabilitation of the Nairne Pyrites Ltd quarry area and treatment of acidic effluent. Progress and final reports on investigations for the period March 1973 to June 1975.
A chemical survey of Dawesley Creek in the Brukunga Mine area has concluded that seepages from the southern mine waste dumps located alongside the creek contribute the greater proportion of pollutants (acidity, iron, aluminium, manganese, zinc,...-
Document
-
RB 2015/00019 Manual of geochemical leaching trials, 2010–2014; Brukunga Mine Remediation Program - Phase 3.
The Brukunga mine site is a former open pit iron sulfide mine that continues to contribute to Acid and Metalliferous Drainage (AMD) into downstream waterways. Mine-based sources of AMD include the waste rock dumps and tailings storage facility. In...-
Document
Published: 01 Jun 2015