-
RB 78/00117 Bumbarlow 1 - Well completion report.
Bumbarlow 1 (TD 720.33 m) aimed to test the lithology and petroleum potential of the Cambrian section in the central part of the eastern Arrowie Basin. It continuously cored a sequence over 300 m thick of flat-lying Proterozoic sediments interbedded...-
Document
Published: 01 Sep 1978
-
Beverley Uranium Project - Groundwater resources, management and monitoring.
The technical development and operational commencement stage of the Beverley in situ leach uranium mining project are herein discussed from the viewpoint of hydrogeological factors. The author summarises the uranium deposit's hydrogeological setting...-
Document
-
Erudina, Stickhole and Lake Namba. Combined annual reports and final report to licences' joint surrender, for the period 25/2/2004 to 19/2/2014. [ Index Part 1 of 2 ].
Three large but quite separate licence areas located at the southern end of the Frome Embayment have been explored together for possible economic buried sedimentary uranium mineralisation hosted by Tertiary palaeochannel sands of the Callabonna...-
Document