-
PEL 47. Progress and technical reports for the period June 1990 to March 1993.
Anzoil NL carried out geological and geophysical studies on previous exploration data, but was unsuccessful in attracting farmin partners either locally or overseas. The licence area was reduced to ease the work commitment, by partial relinquishment...-
Document
Published: 31 Mar 1993
-
Arrowie Block acreage assessment.
During the period January 1946-December 1985 under review, the following petroleum exploration work was carried out over the Arrowie Block: 6 gravity, 2 aeromagnetic and 10 seismic surveys (total seismic coverage 2781 line km), plus 4 wells, all dry....-
Document