-
Lilydale. Data release made in lieu of submitting a first partial surrender report : progress reports, annual reports and final report to licence expiry/renewal over a much reduced area, for the period 5/1/1988 to 4/1/1993.
Initial exploration carried out near Lilydale Homestead, 80 kilometres south-east of Yunta, targeted possible Starra-style gold in the Braemar Ironstone facies. Flying of an airborne semi-detailed magnetic and radiometric survey identified magnetic...-
Document
-
RB 95/00022 Five year technical review, 1991-1995 - Border (Groundwater Agreement) Act, 1985.
The Groundwater (Border Agreement) Act of 1985 legislated to provide a framework for the joint management of groundwater resources within a 40 km wide strip along the length of the South Australian and Victorian Border, which is referred to as the...-
Document
Published: 01 Jun 1995
-
RB 96/00017 River Murray water resource management. Assessment of salt load impacts and drainage hazard for new irrigation development along the River Murray in South Australia.
The Murray-Darling Basin Commission (MDBC) has a commitment in the national interest to managing the health of the River Murray and floodplain environment by mitigating both decreases in river water quality and associated environmental degradation...-
Document
Published: 01 May 1996
-
Data release - as updated [made at SA Director of Mines' discretion] : Olary Project (latterly part of the Lodestone Project). Licence individual annual reports, plus related project joint annual reports, for the period 4/11/2009 to 20/1/2019.
Iluka Resources is exploring for possible economic heavy mineral (HM) deposits that may have formed in the northern Murray Basin, with a strategy of targeting any mineralised Loxton-Parilla Sand formation sediments deposited during the Pliocene marine...-
Document
-
RB 00738 Chowilla Project. Reservoir geological investigations. Progress report no. 2. Proposed study of effects on groundwater regime, Co. Hamley.
It has been appreciated since the first geological report by Johnson, Hiern and Steel (RB 51/00136) that the filling of the proposed Chowilla Dam would cause some flushing downstream of saline groundwater present in sands beneath the Murray River...-
Document
Published: 01 May 1900
-
RB 74/00161 River Murray planning study. Geological features and mineral resources - State Planning Office.
There is no abstract created for this record-
Document
Published: 01 Jan 1974
-
Data release - as updated [made at SA Director of Mines' discretion] : Murray Basin Project. Joint annual reports, plus individual licence final reports at their respective full surrender, for the period 19/12/1997 to 30/6/2018.
Previous investigations of the Late Tertiary Murray Basin shallow marine littoral zone clastic sedimentary sequence (Loxton and Parilla sands) for heavy mineral sand (HM) placer accumulations have discovered numerous occurrences of economic to...-
Document
-
The Mindarie Heavy Mineral Sands Project. Joint and combined annual reports, for the period 19/12/1997 to 31/12/2010.
An assessment of the Late Tertiary Murray Basin shallow marine clastic sedimentary sequence (Loxton and Parilla sands) for heavy mineral sand accumulations has discovered numerous occurrences of economic to sub-economic amounts of heavy minerals...-
Document
Published: 19 Apr 1911