-
Eucla Basin Areas 2, 3 and 4. Joint annual reports and joint first partial surrender report, plus respective licence's final reports to full surrender, for the overall period 29/8/2006 to 28/8/2013.
Three adjoining licence areas that were centred approximately 480 km north-west of Ceduna together occupied the northern section of the Ooldea Range over a stepped NW-SE trending outline having an average width of 25 km and a combined total length of...-
Document
Published: 21 Nov 2013
-
Murat Bay (part of the Watraba Project). Annual reports and final report to licence full surrender, for the period 6/6/2005 to 3/4/2009.
Exploration of an onshore area located immediately north of Murat Bay aimed to discover beach or shallow marine placer concentrations of zircon-rich heavy mineral sands, possibly formed within significant thicknesses of prospective Upper Tertiary...-
Document
Published: 22 May 2009
-
Data release [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Annual, joint annual and combined annual reports for the period 4/1/1999 to 3/1/2009.
A renewed effort to determine the diamond mineral potential of the 15.6 square km of land comprising Flinders Island was instigated during January 1999, under tenure of EL 2577, by Orogenic Exploration Pty Ltd, a company related to the previous...-
Document
Published: 06 Jun 2009
-
Watraba (part of the Watraba Project). Annual reports and final report to licence full surrender, for the period 6/6/2005 to 3/4/2009.
Exploration of an onshore area located in the vicinity of Watraba aimed to discover beach or shallow marine placer concentrations of zircon-rich heavy mineral sands, possibly formed within significant thicknesses of prospective Upper Tertiary Ooldea...-
Document
Published: 20 May 2009
-
Data release - as updated [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Joint annual reports for the period 4/1/2009 to 3/1/2019.
During licence Year 11, the lithological logs were digitised and are now presented for the remaining eight holes of the first drilling program (completed in 2002), together with the holes from the second (2003), and third (2004) drilling programs....-
Document
Published: 01 Mar 2019