-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Assessment of the relationship between variations in porosity and reservoir facies (in) EPP 26.
There is no abstract created for this record-
Document
Published: 12 Aug 1996
-
Sensitivity analysis, [seismic] line DH91-131 2-D modelling, Duntroon Basin.
There is no abstract created for this record-
Document
Published: 12 Aug 1996
-
Mount Christie Siding (part of the Eucla Project). Annual reports and final report to licence expiry/full surrender, for the period 26/7/2005 to 20/3/2013.
The subject licence area, one of eight tenements which constitute Hindmarsh Resources Limited’s (Hindmarsh’s) Eucla [Basin] Project, has been explored for possible buried economic sedimentary uranium deposits that may have formed in Tertiary...-
Document
-
RB 2006/00009 Regolith studies at the Boomerang Gold Prospect, Central Gawler Craton, South Australia
The Boomerang gold prospect is located 650 km north-west of Adelaide in undifferentiated Proterozoic rocks incorporated within Archaean Harris Greenstone Belt mafic lithologies of the Gawler Craton. The prospect was originally discovered using...-
Document
Published: 01 Sep 2006