-
Data release - as updated [made at SA Director of Mines' discretion] : Camel Lake. Annual reports to licence surrender for the period 16/11/2012 to 15/11/2023.
An area located ~ 70 km north-east of Ooldea Siding and 50 km east of Maralinga is being explored for the industrial mineral kaolin, and more particularly its crystallographic form halloysite, which typically occurs as microtubules or nanotubes which...-
Document
Published: 21 Nov 1923
-
Heartbreak Bore (part of Afmeco's Tarcoola Joint Venture Project). Progress reports and final report to licence expiry/full surrender, for the period 16/1/1980 to 15/1/1982.
Portions of regional airborne radiometric and magnetic surveys, plus a small part of the HW-IV seismic refraction traverse, and 20 line km of gravity and ground magnetic surveys, were undertaken by joint venture operator Afmeco as part of its Project...-
Document