-
EPP 11, Eucla and Bight Basins. Progress and technical reports for the period 8/11/68 to 26/4/77.
EPP 11 was taken up by Shell in mid-1968 as high risk, potentially high reward frontier acreage over very deep water (200 to 2000 metres) in the Great Australian Bight outer continental shelf / continental slope region of South Australia. At that...-
Document
Published: 26 Apr 1977
-
EPP 10, Eucla and Bight Basins. Progress and technical reports for the period 8/11/68 to 26/4/77.
EPP 10 was taken up by Shell in mid-1968 as high risk, potentially high reward frontier acreage over very deep water (200 to 2000 metres) in the Great Australian Bight outer continental shelf / continental slope region of South Australia. At that...-
Document
Published: 26 Apr 1977