RB 77/00009 Construction materials investigation Redcliff petrochemical site, sections 12, 18, 99, 100, 101, 102, 103, 104, 102, 134 Hd Winninowie, Co. Frome.
Materials suitable for concrete aggregate, railway ballast, road base course, protection of salt field sea wails and rock fill will be required should construction of the petrochemical plant and appurtenant works proceed at Redcliff, 25 km...-
Document
Published: 01 Jan 1977
-
RB 00811 Redcliff Project: geological setting and preliminary assessment of environmental factors.
This report has been compiled at the request of the Redcliff Steering Committee to assist in the preparation of an Environmental Impact Statement. It relies almost entirely on work carried out by Departmental officers and private consultants during...-
Document
-
Lake Torrens Areas 1 and 2, Lake Torrens South and Lake Torrens North (the Lake Torrens Brine Potash Project). First joint annual report plus final report to licences' joint full surrender, for the period 5/1/2015 to 16/6/2016.
Much of the eastern side of the very large, 5,745 square km saline playa Lake Torrens, which occupies one of the most arid parts of Australia, was taken under licence by a Northern Territory - based company with the intent of systematically sampling...-
Document
Published: 14 Jun 1916
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014