-
RB 77/00009 Construction materials investigation Redcliff petrochemical site, sections 12, 18, 99, 100, 101, 102, 103, 104, 102, 134 Hd Winninowie, Co. Frome.
Materials suitable for concrete aggregate, railway ballast, road base course, protection of salt field sea wails and rock fill will be required should construction of the petrochemical plant and appurtenant works proceed at Redcliff, 25 km...-
Document
Published: 01 Jan 1977
-
Kybunga (latterly a part of the Balaklava HMS Project - Iluka tenements Group 9). First annual report 3/5/2012 to 2/5/2013, plus a joint annual report and final report for Group 9 submitted at the five project licences' full surrender on 24/9/2015.
Ground within the northern onshore Saint Vincent Basin was taken up by Iluka Resources to re-appraise the heavy mineral sands (HMS) potential of buried Tertiary sediments there, after some unsuccessful exploration had previously been undertaken in the...-
Document
Published: 22 Sep 2015