-
1991 marine seismic survey, OH91, final report.
AIM: To detail certain prospects and leads identified from interpretation of pre-existing seismic data, in order to mature at least one play for drilling in permit Year 4. METHODS: Survey dates: 3 - 6/5/91. Energy source: Air gun. CDP coverage: 6000%....-
Document