-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Elliston, western Eyre Peninsula. Annual reports and final report to licence full surrender, for the period 21/2/1996 to 23/12/1998.
Diamond, gold and platinum group element (PGE) exploration activities carried out within an area of known kimberlitic and lamproitic intrusive rocks east of Elliston comprised aircore drilling (23 holes, total 1188 metres), addressing 17 out of 36...-
Document
-
Green Patch. Progress, annual and final reports to licence surrender for the period 8/7/1991 to 1/3/1996.
Following a review of previous company exploration and image interpretation of SAEI and BMR aeromagnetic data, a 3166 line km airborne magnetic/radiometric survey, with follow-up ground magnetics and air core drilling (282 holes, 4559 m), was carried...-
Document