RB 44/00063 Myponga Dam Project - Geological investigation of the tunnel route on the proposed pipeline from the reservoir.
Detailed geological examination of the area in the vicinity of the proposed tunnel has shown that, provided suitable precautions are taken, there are no geological factors which will prevent the successful construction of a tunnel through the ridge...-
Document
Published: 02 May 1957
-
Data release - as updated [made at SA Director of Mines’ discretion] : Boolooroo Goldfield and Kate Hill. Joint annual reports for the period 2/1/2009 to 8/2/2019.
Two adjoining licence areas located ~ 40 km north-east of Leigh Creek township, in the ranges lying immediately east of the Telford coal basin, are being explored for possible economic occurrences of marble rock which are believed to hold enormous...-
Document
-
Price. Progress reports to licence expiry/renewal, for the period 24/2/1975 to 23/2/1977.
In continuing regional exploration conducted over north-eastern Yorke Peninsula, further reconnaissance stratigraphic drilling and wireline geophysical logging (in 3 vertical rotary percussion holes totalling 373 m) was carried out in May 1976 to test...-
Document
-
RB 2010/00019 Hardrock extractive minerals for metropolitan Adelaide - strategic review. [Summary version]
The purpose of the project is to provide essential data on the hardrock extractive (construction material) resources supplying the Adelaide metropolitan area, in order to be able to: - Critically examine current hardrock supplies and resources and how...-
Document
Published: 01 Oct 2010