-
Paratoo. Annual reports and final report to licence expiry/full surrender, for the period 4/11/1996 to 3/5/1998.
1:40,000 scale geological mapping and soil geochemical sampling performed in the vicinity of the Paratoo copper mine, 300 km north-east of Adelaide, demonstrated both structural and lithological controls to known mineralisation. Stored historic...-
Document
-
Uroonda. Progress and final reports to licence surrender for the period 18/6/1970 to 17/12/1971.
During base metal exploration conducted in the hills on the eastern side of the Springfield Basin, just south of Cradock township, minor copper and lead anomalies were disclosed by regional stream sediment sampling (1090 samples assayed). There...-
Document
Published: 23 Dec 1971
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-49, Bird-In-Hand Mine Deeps Project gold mineral prospects. Project final report.
At the historic Bird-In-Hand mining claim, where previous mine exploration drilling beneath the old workings by current licence operator Maximus Resources had delineated an inferred remaining gold resource of 53,000 ounces over the depth extent from...-
Document