-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Oak Dam North-east. Annual reports for the period 18/1/2006 to 17/1/2011.
A relatively large but little-explored area of the central-eastern Stuart Shelf, which is almost wholly covered by scrubby sand dunes and swampy salt lakes, thereby making surface access very difficult despite it being located only ~30 km to 50 km km...-
Document
Published: 16 Mar 1911
-
Data release - as updated [made at SA Director of Mines’ discretion] : Glenside. Annual reports to licence expiry/renewal, for the period 5/12/2005 to 4/12/2010.
An area centred approximately 40 km south of the Andamooka Opal Field and 50 km south-east of the Olympic Dam mine is being explored for possible buried economic Olympic Dam or Prominent Hill type IOCG-U mineralisation as well as for possible...-
Document
Published: 28 Jan 1911
-
Woomera and Wirrappa. Annual reports and first joint annual report, plus final report to licences' joint full surrender, for the period 14/1/2013 to 13/11/2018.
Two adjacent areas located immediately south and east of Woomera township were taken up to search for possible buried economic stratabound deposits of copper or other metals that may have formed in the Neoproterozoic and Mesoproterozoic cover sequence...-
Document
Published: 07 Jan 1919
-
West Lake Torrens (part of the Murdie Project). Final report for geophysical, drilling and logistics program, Project ADI RD01-120 [part of Accelerated Discovery Initiative Round 1, 2021].
ADI funding was granted by DEM to Kelaray to conduct approved geophysical surveys and exploratory drilling and apply logistical support within its Murdie Project, for a combined expenditure of up to A$320,000. At the outset of the project, Kelaray...-
Document
-
Winjabbie. First partial surrender report at licence expiry/renewal, for the period 20/10/2005 to 19/10/2010.
The western half of EL 3432, which now lies within the continuously restricted access Red Zone of the Woomera Prohibited Area, has been relinquished at expiry of term, acting upon advice received from DMITRE. During its 5-year tenure period the...-
Document
Published: 03 Dec 1912
-
Data release [made at SA Director of Mines' discretion] : Pernatty Lagoon [East]. Annual reports to licence expiry/renewal, for the period 27/6/1997 to 26/6/2002.
An area of the Stuart Shelf located between Pernatty Lagoon and the Beda Arm of Lake Torrens, with its western boundary lying 15 km east of the historic Mount Gunson copper mining field, is being explored for possible economic basement-hosted IOCG...-
Document
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014