-
Macclesfield (part of the Mount Barker Project). Annual reports and final report to licence expiry/full surrender, for the period 6/4/2016 to 5/6/2019.
An area surrounding the township of Macclesfield, and lying a short distance south-east of Terramin Limited's Bird-in-Hand historic gold mine redevelopment project, has been explored for inferred sediment-hosted primary gold mineralisation that may...-
Document
Published: 13 Jun 1919
-
Echunga (part of the Mount Barker Project). Annual reports, first partial surrender report and final report to licence full surrender, for the period 7/7/2016 to 5/6/2019.
An area surrounding the historic Echunga goldfield locality, and lying a short distance south-east of Terramin Limited's Bird-in-Hand historic gold mine redevelopment project, has been explored for inferred sediment-hosted primary gold mineralisation...-
Document
Published: 13 Jun 1919
-
Meadows (part of the Mount Barker Project). First annual report plus final report to licence expiry/full surrender, for the period 20/4/2017 to 19/4/2019.
A small area covering part of the Meadows Fault scarp and part of the adjoining Tertiary-Recent Meadows Basin has been explored for inferred sediment-hosted primary gold mineralisation that may have formed in favourable Neoproterozoic bedrock...-
Document
Published: 13 Jun 1919
-
Hallett (part of the Nackara Gold Project). Annual reports and final report to licence expiry/full surrender, for the period 9/8/2002 to 4/10/2012.
An area of high country in the far northern Mount Lofty Ranges was taken under licence to try to find the primary source(s) of widely dispersed detrital gold known from Recent and Tertiary cover sediments in the region, while focussing mainly on...-
Document