-
RB 88/00057 Torrens Hinge Zone Project - Bute region. Second and final report.
The Torrens Hinge Zone Project aimed to demonstrate the existence of prospective metalliferous rocks beneath the Cainozoic cover, to stimulate exploration and to investigate the transition between the Adelaidean sequences of the well-exposed Adelaide...-
Document
Published: 01 Aug 1988
-
Stuart Creek. Progress reports and final report to licence expiry/full surrender, for the period 20/8/1979 to 18/10/1982.
One vertical stratigraphic diamond drillhole [the 1a re-drill] was fully cored to 1450 m total depth over a regional gravity high in the western half of the licence which was thought to be prospective for Olympic Dam type polymetallic mineralisation...-
Document
-
ExpNotes CURDIMURKA: Explanatory Notes CURDIMURKA, SH 53-08.
There is no abstract created for this record.-
Document