-
Data release - as updated [made at SA Director of Mines' discretion] : Kainton, Melton and Paskeville (the Melton Project). Joint annual reports for the period 27/8/2007 to 26/8/2019.
Exploration for possible buried sandstone-hosted uranium mineralisation which could have formed within early Tertiary palaeochannel sediments of the northern Saint Vincent Basin is being carried out in a small area near Kainton on north-eastern Yorke...-
Document
-
Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project, then the Coober Pedy Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 2 of 4 ].
After Poseidon Exploration took over the management of ELs 1448 and 1465 in November 1991 as a result of a supplementary farm-in agreement made with Burmine, whereby Poseidon would fund the next two year's of exploration to earn Burmine's 50% interest...-
Document
-
Maitland. First partial surrender report, for the period 7/9/1992 to 6/3/1996.
Exploration in the Curramulka and Pine Point areas on east-central Yorke Peninsula targeted Olympic Dam style iron oxide - associated copper-gold (IOCG) deposits related through contact metasomatism to Hiltaba Suite equivalent granites. A gravity...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-18 - Phoenix Copper Limited Yorke Peninsula Project. Drilling project final report.
Phoenix Copper is exploring tenements which cover an area of approximately 802 square km on the west coast of the Yorke Peninsula, the company's prime objective being to discover an economic iron oxide - associated copper-gold-uranium (IOCGU) deposit...-
Document
Published: 13 Nov 2012
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 2011
-
Data release - as updated : Minlaton South-west, Minlaton, Oaklands and Stansbury (the Yorke Peninsula Project). Annual reports, plus joint final report at remaining licences' respective expiry/full surrender, for the period 21/1/2008 to 10/10/2019.
Phoenix Copper has been exploring several tenement blocks located on western Yorke Peninsula, the prime objective being to discover an economic iron oxide - associated copper-gold-uranium (IOCGU) deposit that may have formed in buried Proterozoic...-
Document
Published: 27 Nov 2019